Building |
62 First |
Proposed |
5 |
|
Orangeville |
Building |
Kingsway Terrace Condominium |
Never Built |
7 |
|
Toronto |
Building |
The Roxborough |
Complete |
7 |
|
Newmarket |
Building |
The Grand |
Proposed |
11 |
|
Cambridge |
Building |
SYNC |
Registered |
8 |
|
Toronto |
Building |
200 Keele - Structure 2 |
Proposed |
4 |
|
Toronto |
Building |
South Beach Condos and Lofts - Structure 2 |
Registered |
27 |
|
Toronto |
Building |
Evolution |
Construction |
12 |
|
Toronto |
Building |
200 Keele - Structure 1 |
Proposed |
4 |
|
Toronto |
Building |
Waterscape - Phase 2 |
Proposed |
12 |
|
Oakville |
Building |
The Claridges |
Registered |
9 |
|
Toronto |
Building |
South Beach Condos and Lofts - Structure 1 |
Registered |
27 |
|
Toronto |
Building |
Amica Oakville |
Proposed |
8 |
|
Oakville |
Building |
Amica at Bayview |
Complete |
8 |
|
Toronto |
Building |
The Carlaw |
Construction |
12 |
|
Toronto |
Building |
Diversicare Tower |
Construction |
17 |
|
Toronto |
Building |
5575 Bonnie |
Complete |
6 |
|
Mississauga |