Three Hundred Front Street West
Toronto, Ontario, Canada

  • Image of Three Hundred Front Street West (Complete)
  • Image of Three Hundred Front Street West (Complete)
Image of Three Hundred Front Street West (Complete)

Identification

Also Known AsThree Hundred Front Street West[1]

AddressApproximately 300 Front Street West[1][2][3]

Postal CodeM5V 0E9[1][2][3]

FrontsFront Street, and John Street

NeighbourhoodWaterfront Communities-the Island

CityToronto, Ontario, Canada

Urban AgglomerationGreater Golden Horseshoe

ComplexThree Hundred Front

Nearby BuildingsCBC Broadcasting Centre, 310 Front Street West, The Jefferson, Marriott Residence Inn - Wellington, 325 Front, The Icon - East Structure, 330 Front Street West, CN Building, Royal Bank Data Centre, and 205 Wellington

Nearby ParksBobbie Rosenfeld Park, Isabella Valancy Crawford Park, Metro Hall, Olympic Park, and Simcoe Park

WardTrinity-Spadina (20)

Technical

TypeSkyscraper

DesignationCommercial[3], Rental[7], and Residential[2]

StatusComplete

Amenity Total1,162m² (12,507.66f²)[2]

Commercial349m² (3,756.6f²)[3]

Residential57,813.9m² (622,303.64f²)[2]

Floors Above-Ground49[4][5][6]

Floors Below-Ground2[5][7][11]

Height (Non-Specific)156m (511.81f)[3]

Residential Suite Count676[1][5][11]

Residential Suite Maxsize278.71m² (3,000f²)[6][12]

Residential Suite Minsize45.52m² (490f²)[14]

AmenitiesCommunity Barbecues[10][15], Concierge[16], Fitness Facilities[2][6][10], Games Room[6][10][15], Garden[2][5][6], Multimedia Room[2][6][10], Events Room[2][6][10], Hot Tub[6][10][15], Pool - Outdoor[2][6][10], Rooftop Deck/Garden[16], Steam Room[10][15], Visitor Parking[16], and Water Feature[10]

Companies

ArchitectWallman Clewes Bergman Architects[5][6][7]

Civil EngineersR V Anderson Associates Ltd[5][7][11]

Concrete SubContractorToronto Redi Mix Ltd.[11]

DeveloperTridel Corporation[5][7][9]

Electrical ContractorJay Electric Ltd.[11]

Electrical EngineeringNovatrend Engineering Group Ltd[5][7][11]

Elevator ContractorThyssenKrupp Elevator Can Ltd[11]

Excavating ContractorAnpro Environmental Group Inc[11]

Fire Alarm System ContractorJay Electric Ltd.[11]

Formwork ContractorAvenue Building Corporation[11]

Foundation ContractorAnchor Shoring & Caissons Ltd[11]

General ContractorDeltera Inc.[5][7][11]

HVAC ContractorBellwood Sheet Metal[11]

Interior DesignChapman Design Group[6]

Landscape ArchitectClaude Cormier Architects Paysagistes Inc.[5][6][7]

Masonry ContractorVenice Construction[11]

Mechanical EngineeringNovatrend Engineering Group Ltd[5][7][11]

Mechanical Trades ContractorPrimo Mechanical[11]

Plumbing ContractorPrimo Mechanical[11]

Reinforcing Steel ContractorSalit Steel Niagara Ltd[11]

Sitework ContractorAnpro Excavating & Grading Ltd[11]

Sprinkler Systems ContractorPrimo Mechanical[11]

Structural EngineeringJablonsky, Ast and Partners[5][7][11]

Waterproofing ContractorProtech Roofing[11]

Windows-Glass-GlazingToro Aluminum[11]

History

Estimated Occupancy (2012)

Three Hundred Front Street West - CompleteThree Hundred Front Street West - CompleteThree Hundred Front Street West - CompleteThree Hundred Front Street West - Complete

Construction (2011 to 2012)

Excavation (2010 to 2011)

Proposed (2007 to 2010)

Complete (2012 to 2007)

References

  1. 2013-06-05: Reed Construction Data, Daily Commercial News and Construction Record, "Construction continues on Tridel 49-storey tower in Toronto "
  2. 2007-06-04: City of Toronto - Toronto and East York Community Council, "300 Front West Preliminary Report"
  3. 2008-04-04: City of Toronto - City Council, "300 Front West Final Report"
  4. 2008-09-26: The Globe and Mail, "49-storey project for Entertainment District", Sydnia Yu
  5. 2009-06-05: Reed Construction Data, "300 Front St, John St, M5V 3B5"
  6. 2009-06-08: HomeGuides, CondoGuide - The GTA Edition, "Another outstanding Tridel Community coming to downtown Toronto at Front and John", page(s) 78
  7. 2009-07-02: Reed Construction Data, "300 Front St, John St, M5V 3B5"
  8. 2009-12-02: City of Toronto - Toronto and East York Community Council, "TE30.3 - Staff Report - 300 Front Street West - Supplementary Report"
  9. 2010-03-27: HomeGuides, Condo Builders Annual, "2010 Annual Edition"
  10. 2010-11-05: The Toronto Star, "Condos on the Market: Toronto West"
  11. 2011-01-28: Reed Construction Data, "300 Front Street West, 300 Front St, John St, M5V 3B5"
  12. 2008-10-13: HomeGuides, CondoGuide - The GTA Edition, "Tridel launches an urban oasis in downtown Toronto", page(s) 46
  13. 2009-11-24: Reed Construction Data, "300 Front St, John St, M5V 3B5"
  14. 2011-03-03: The Toronto Star, "Condos on the Market"
  15. 2011-11-21: The Toronto Star, "Site Seeing"
  16. 2015-04-10: The Toronto Star, "What They Got: Condos"
  17. 2010-05-25: Condo Life, "June 2010 Edition"
  18. 2010-10-13: Urban Toronto, "Quick Pic: Excavation Slowly Begins At Tridel's 300 Front West Condo"
  19. 2011-05-17: http://www.rafbig.com/
  20. 2010-07-01: Condo Life, "July 2010 Edition"