Building |
Claireville Heights - Structure 2 |
Proposed |
12 |
|
Brampton |
Building |
Visto Condominiums |
Proposed |
8 |
|
Toronto |
Building |
243 Eglinton - Structure 1 |
On Hold |
6 |
|
Toronto |
Building |
243 Eglington - Structure 2 |
On Hold |
6 |
|
Toronto |
Building |
Allegra - Structure 1 |
Construction |
10 |
|
Vaughan |
Building |
Expo-3 |
Proposed |
|
|
Vaughan |
Building |
Expo-4 |
Proposed |
|
|
Vaughan |
Building |
Expo-1 |
Construction |
37 |
|
Vaughan |
Building |
Expo-5 |
Proposed |
|
|
Vaughan |
Building |
Expo-II |
Proposed |
37 |
|
Vaughan |
Building |
The Admiral Collingwood Place |
On Hold |
6 |
|
Collingwood |
Building |
Allegra - Structure 2 |
Construction |
10 |
|
Vaughan |