Upsidedown Condominium - Structure 1
Toronto, Ontario, Canada
Identification
Also Known AsElectric City[1], Upside Condos[1], and Upsidedown Condominium - Structure 1[1]
FrontsDupont Street, and Lansdowne Avenue
NeighbourhoodDovercourt-Wallace Emerson-Juncti
CityToronto, Ontario, Canada
Urban AgglomerationGreater Golden Horseshoe
ComplexElectric City Complex
Nearby ParksBeaver Lightbourn Parkette, Campbell Avenue Playground, Perth Square Park, Symington Avenue Playground, and Wallace Emerson Park
WardDavenport (18)
Technical
TypeMid-Rise
DesignationResidential Condominium[2][3][4]
StatusComplete
Floors Above-Ground11[11]
Suite Maxsize91.51m² (985.01f²)[16][17]
Suite Minsize46.45m² (499.98f²)[16][17]
Residential Suite Count297[3][4][6]
AmenitiesFitness Facilities[1][3][4], Games Room[1][9], Multimedia Room[1][9], Events Room[3][4][6], Squash/Racketball Court[3][4][6], and Sauna[9]
Companies
ArchitectBurka Architects Inc.[3][4][6]
Construction ManagerThe Moro Group[8][9][10]
DeveloperBrownstones Group[16]
DeveloperChannington Developments[1][2][3]
Electrical EngineeringComfort Solutions Engineering[4][6][8]
Electrical EngineeringCSEI Comfort Solutions Engineering[8][9][10]
General ContractorChannington Developments[3][4][6]
Mechanical EngineeringComfort Solutions Engineering[4][6][8]
Mechanical EngineeringCSEI Comfort Solutions Engineering[8][9][10]
Structural EngineeringNCK Engineering Ltd.[4][6][8]
History
Complete (2013)
Construction (2011 to 2013)
Excavation (2011)
Proposed (2008 to 2011)
References
- 2010-11-19: The Toronto Star, "Condos on the Market: Toronto Central"
- 2009-06-08: HomeGuides, CondoGuide - The GTA Edition, "Electric City", page(s) 86
- 2009-12-11: Reed Construction Data, "Electric City Condominium, Phase One, Dupont St, Lansdowne Ave, M5K"
- 2010-04-01: Reed Construction Data, "Electric City Condominium, Phase One, Dupont St, Lansdowne Ave, M5K"
- 2010-05-25: Condo Life, "June 2010 Edition"
- 2010-06-18: Reed Construction Data, "Electric City Condominium, Phase One, Dupont St, Lansdowne Ave, M5K"
- 2010-11-01: Condo Life, "November 2010 Edition"
- 2011-03-31: Reed Construction Data, "Upsidedown Condominium, Phase One (formerly Electric City), Dupont St, Lansdowne Ave, M5K"
- 2011-05-16: Reed Construction Data, "Upsidedown Condominium, Phase One (formerly Electric City), Dupont St, Lansdowne Ave, M5K"
- 2011-07-05: Reed Construction Data, "Upsidedown Condominium, Phase One (formerly Electric City), Dupont St, Lansdowne Ave, M5K"
- 2012-02-18: Reed Construction Data, Daily Commercial News and Construction Record, "Construction continues on the Upsidedown Condos Phase 1 in Toronto"
- 2009-12-11: Reed Construction Data, "Electric City Condominium, Phase Two, Dupont St, Lansdowne Ave, M5K"
- 2010-04-01: Reed Construction Data, "Electric City Condominium, Phase Two, Dupont St, Lansdowne Ave, M5K"
- 2010-06-18: Reed Construction Data, "Electric City Condominium, Phase Two, Dupont St, Lansdowne Ave, M5K"
- 2011-02-04: Reed Construction Data, "Upsidedown Condominium, Phase One (formerly Electric City), Dupont St, Lansdowne Ave, M5K"
- 2008-10-03: The Globe and Mail, "Davenport high-rise aims for affordability", Sydnia Yu
- 2009-08-07: National Post, "First-time buyers: Getting to the heart of the matter", Lisa Van De Ven