Crates Landing Phase 1 - Structure 2
Georgina, Ontario, Canada
Identification
Technical
Companies
ArchitectSaplys Architects[2]
DeveloperAugustine Group[2]
DeveloperBright Star Corporation[1][2][3]
DeveloperFortress Real Capital[2]
Electrical EngineeringMCW Consultants Ltd.[1][2][3]
General ContractorNiacon Construction[3][4][5]
Mechanical EngineeringMCW Consultants Ltd.[1][2][3]
Sitework ContractorNiacon Construction[2]
Structural EngineeringKO and Partners[1][2][3]
History
On Hold (2013)
Proposed (2006 to 2013)
References
- 2012-02-29: Reed Construction Data, "Crates Landing at the Maskinonge River - Phase One, Cameron Cres at the Queensway, L4P"
- 2014-05-26: Reed Construction Data, "Crates Landing, Grand Marina - Phase One, Cameron Cres, Hwy 404 in Keswick, L4P"
- 2012-06-22: Reed Construction Data, "Crates Landing at the Maskinonge River - Phase One, Cameron Cres at the Queensway, L4P"
- 2012-12-04: Reed Construction Data, "Crates Landing at the Maskinonge River - Phase One, Cameron Cres at the Queensway, L4P"
- 2013-04-08: Reed Construction Data, "Crates Landing at the Maskinonge River - Phase One, Cameron Cres at the Queensway, L4P"